Ship Loader Cable Replacements

Enfra was engaged to undertake cable replacements on the shiploader systems at Cairns and Mourilyan. The works involved disconnecting and removing existing cabling between slip rings, shiploader motors, and marshalling panels, followed by installation of new cables and support brackets.

All circuits were tested and commissioned to verify operational integrity. These works were critical in maintaining reliability and safe operation of the shiploader equipment.


Client: Queensland Sugar Limited
Location: Cairns & Mourilyan, QLD